Bangladesh's steel industry is a large, scrap-based, privately built sector centred on Chittagong — and, in the mid-2020s, a sector with far more capacity than customers. According to estimates of the Bangladesh Steel Manufacturers Association (BSMA) reported in September 2025, the country has nearly 200 steel mills, including about 40 large-scale plants, with installed capacity of 11 to 12 million tonnes a year. Demand that usually ran above 6 million tonnes had fallen to about 5 million tonnes by 2025, and by October 2026 the BSMA put annual consumption at only about 4 million tonnes, down from about 7 million tonnes in better years. Per-capita consumption is estimated at just 43 to 45 kilograms a year, against a world average of 214.7 kilograms in 2024. In the short term its story is one of overcapacity, expensive energy, high interest rates and a raw-material model that depends almost entirely on imported scrap and the shipbreaking beaches of Sitakunda. This article traces how the industry really began — in 1952, not 1984 — and why 2024 to 2026 have been among its hardest years.

History

Steel milling began in 1952, when the Akberali family set up Bangladesh Steel Re-Rolling Mills (BSRM) at Nasirabad, Chittagong, with four manual rolling mills producing plain bars. It was a re-rolling business, not an integrated steelworks: it reshaped imported and salvaged steel rather than smelting ore. The manual mills were replaced by an Italian-built rolling mill in 1970, and BSRM added its own billet plant only in 1996.

The state's attempt at integrated steelmaking came a decade and a half later. Chittagong Steel Mills, set up by the then East Pakistan Industrial Development Corporation on more than 220 acres beside the Karnaphuli river, went into commercial production in 1967 — sources differ on whether February or August — and became a separate company in 1972, later administered by the Bangladesh Steel and Engineering Corporation. For three decades it made ingots, billets, bars, sections, plates and corrugated sheets, but accumulated losses of Tk 733.17 crore over the 32 years to 1998-99. It closed on 7 July 1999; its land became the Karnaphuli EPZ and its machinery was sold as scrap.

What replaced it was private and Chittagong-based. Re-rolling mills multiplied around imported billets and shipbreaking scrap; Kabir Steel (KSRM) traces its steel business to 1984 — the year the old article wrongly gave as the industry's founding — as does Ratanpur Steel (RSRM). Growth accelerated after 1990, as construction expanded and large groups built melting shops: Abul Khair Steel moved from corrugated sheets (1993) into rods (2009) and, in 2015, installed the country's first electric arc furnaces; GPH Ispat, founded in 2006, commissioned Asia's first Quantum furnace plant in 2021. By the early 2020s steel was one of the country's largest industrial investments, put at over Tk 1 lakh crore in 2026 reporting.

Market and Capacity

The industry's central problem is arithmetic: capacity kept rising into a falling market. BSMA estimates reported in 2025-26 put installed capacity at 11 to 12.2 million tonnes a year, and BigMint expected roughly 3 million tonnes more by 2026-27, taking capacity toward 15 million tonnes. Crude production is far lower: worldsteel figures cited in the Bangladeshi press put output at about 5.0 million tonnes in 2023 and 4.5 million tonnes in 2024, while BigMint estimated 5.4 million tonnes for 2024 — the sources differ, but all show production well under half of capacity, with mills running at 50 to 70 percent utilisation in 2025 and 40 to 60 percent by late 2026.

Money estimates vary just as widely, which is why they must be dated. The Daily Star put the market at about Tk 72,000 crore in October 2022; The Business Standard at about Tk 55,000 crore a month later; an investor portal linked to the Bangladesh Investment Development Authority at around $5 billion, with the top three producers holding about half. None supports a neat single figure for market size, share of GDP or growth rate. Production is concentrated around Chittagong, close to the port, shipbreaking yards and imported scrap, with newer plants at Sitakunda and Mirsarai.

Raw Materials and Shipbreaking

Bangladesh makes steel without iron ore. Its one known discovery — magnetite found by the Geological Survey of Bangladesh in 2019 at Isobpur in Dinajpur, with an early resource estimate of 625 million tonnes — was later judged commercially unviable: follow-up drilling found iron content of only about 10 percent, well below the roughly 30 percent needed for extraction, and the site has lain idle since. There is no commercial iron ore mining, and no blast-furnace route based on domestic ore.

Instead, furnaces melt scrap. In FY2024-25 the country imported about 5.29 million tonnes of ferrous scrap and generated nearly 1 million tonnes domestically, so imports supplied about 84 percent of total supply of 6.29 million tonnes. Historically more than 60 percent of imported scrap came from the European Union — a dependence that matters because draft EU waste-shipment rules would exclude Bangladesh as a destination for EU metal waste from May 2027 unless its application to remain eligible succeeds.

The distinctive domestic source is shipbreaking. The yards at Sitakunda, north of Chittagong, dismantle end-of-life ships and sell the recovered plate and scrap to mills. The flow has thinned dramatically: data from the Ministry of Industries and the shipbreakers' association show 231 scrap ships of nearly 2.49 million tonnes imported in 2015, falling to 173 ships of 1.02 million tonnes in 2023 and about 130 ships of 0.8 million tonnes in the first ten months of 2024, with only about 30 to 35 of 116 listed yards actively importing. By vessel count Bangladesh was still the world's leading ship-recycling destination in 2024, handling about 130 of the 409 ships dismantled worldwide, according to the NGO Shipbreaking Platform; in 2025 it lost the top spot to India, taking 88 ships of 2.68 million tonnes against India's 111 ships of 3.36 million tonnes.

Regulation is reshaping the trade. Bangladesh acceded to the Hong Kong Convention on 26 June 2023, and its accession — with Liberia's the same day — triggered the Convention's entry into force on 26 June 2025. The PHP Family led the shift: PHP Ship Breaking and Recycling Industries became the country's first green, Convention-compliant yard in 2017. Compliance is still incomplete — about 17 yards were approved by February 2026, with upgrades costing Tk 300 million to Tk 1 billion per yard — and tighter rules are one reason ship arrivals, and scrap supply, have fallen.

Major Players

Four groups dominate long-steel production. A BigMint study reported in 2024 gave BSRM about 25 percent of domestic demand, Abul Khair Steel 14 percent, GPH Ispat 8 percent and KSRM 6 percent; GPH's management described it in late 2025 as the third-largest player with more than 10 percent, after BSRM and Abul Khair. The ranking is contested; the leaders are not.

BSRM, the 1952 pioneer, remains the largest and, in the downturn, the most profitable. By early 2025 it had rolling and melting capacity of about 2.4 million tonnes each, and in February 2025 BSRM Steels opened a further 0.6 million-tonne rod plant at Mirsarai, built for about $217 million. In FY2024-25 the listed parent earned a record consolidated profit of Tk 614 crore on revenue of Tk 96.64 billion, up 42 percent, while BSRM Steels earned Tk 517 crore. In July 2026 it announced a Tk 10,000 crore integrated flat-steel plant at Mirsarai with 1.5 million tonnes of capacity, aimed at the flat products Bangladesh currently imports in full.

Abul Khair Steel (AKS) is the capacity leader in rods. It introduced electric arc furnace steelmaking to Bangladesh in 2015 at Sitakunda, has melting capacity of about 2.0 million tonnes, and in October 2025 commissioned an ultra-high-speed SMS rebar mill of 1.6 million tonnes a year, taking rolling capacity to about 3.0 million tonnes; it was also the first producer approved for 700-grade rods. GPH Ispat is the technology showcase and the clearest casualty of the slump: its Quantum furnace plant at Sitakunda, commissioned in 2021 with 840,000 tonnes of billet capacity and total melting capacity of about 1.05 million tonnes, carries high fixed and energy costs, and in FY2024-25 it posted its first annual loss since listing — Tk 24.68 crore, against a profit of Tk 85.77 crore the year before. KSRM runs a composite Sitakunda plant of about 800,000 tonnes a year, built out of a shipbreaking business.

Around them sits a second tier — PHP Family's steel mills, Anwar, Mostafa-Hakim's HM Steel and others — and two large announced entrants, Bashundhara Group (about Tk 12,350 crore planned for capacity above 3.0 million tonnes) and Meghna Group (an IFC-financed 1.4 million-tonne melting plant under construction from 2024), whose capacities are not yet verified in production. The tier also holds a warning: RSRM's factories have been shut since December 2020, when power was cut over about Tk 40 crore of unpaid bills, and its group faces roughly Tk 2,500 crore of defaulted loans.

Demand and Consumption

Steel demand is construction demand. In normal years public projects take about 60 percent of consumption, household building about 25 percent and commercial construction about 15 percent — which is why the industry rises and falls with the government's development budget. BigMint estimated consumption at 7.6 million tonnes in 2023 and 7.5 million tonnes in 2024, already below its 8.5 million-tonne projection. Public construction then stalled after the political changeover of August 2024: the development-budget implementation rate in FY2024-25 was 68 percent, the lowest in 20 years, and by October 2026 the BSMA estimated consumption at about 4 million tonnes, with the government's share down to about 20 percent. Private housing demand weakened at the same time under high interest rates.

Per-capita figures underline both the slump and the potential. At 43 to 45 kilograms per person per year, Bangladeshi steel use is roughly a fifth of the 2024 world average of 214.7 kilograms, and earlier projections — 73 kilograms by 2022, let alone 100 kilograms by 2030 — have already been missed once. The long steel consumed is overwhelmingly rebar and sections for buildings and infrastructure; flat steel for manufacturing is barely produced at home at all.

The trade figures correct any impression of an export industry. Bangladesh is a net importer: it imports essentially all of its more than 2 million tonnes a year of hot-rolled flat, mild and stainless steel, worth an estimated Tk 14,000-15,000 crore annually. Finished long-steel exports are small — National Board of Revenue data show earnings under the main rebar heading of $13.86 million in FY2024-25, after $11.88 million in FY2023-24 and a peak of $19.20 million in FY2021-22, going mainly to India's north-eastern states. The one large export episode was semi-finished: in 2020-21, with home demand depressed by the pandemic, GPH Ispat shipped about 120,000 tonnes of billet to China worth some $71 million, the country's first bulk billet exports — an exception driven by distress at home, not the start of a broad export trade to the Middle East, Southeast Asia and Africa.

Energy and Cost Pressures

Steelmaking needs three inputs above all — electricity, gas and working capital — and in 2024-26 all three turned hostile at once. Gas is the sharpest constraint: re-rolling mills need it to reheat billets, and a price increase from about Tk 14 to about Tk 34 per unit, imposed on a promise of uninterrupted supply, was followed by pressure falling to near zero at times in industrial belts; in October 2026 the BSMA said areas that had received no pressure were getting about 30 to 40 percent. Millers estimate higher gas, electricity and VAT together added Tk 10,000 to Tk 12,000 to the cost of a tonne of rod. Electricity prices rose about 18 percent, international scrap prices about $20 a tonne, while a weaker taka and dollar and letter-of-credit shortages made imported scrap harder to finance.

Finance compounded the squeeze. High interest rates raised the cost of the working capital on which scrap purchases depend, and the most leveraged producers felt it first: GPH Ispat's revenue fell by nearly a quarter in the first nine months of FY2025-26 and, carrying liabilities of about Tk 12,000 crore, it sought central-bank relief to restructure debt with more than two dozen lenders. By late 2026, seven to ten mills were reported shut entirely — the industry's current situation is not a pandemic, as the old article claimed years after the fact, but this interlocking crisis of gas, credit and demand.

Challenges

The structural challenges follow from everything above. First, overcapacity: 11 to 12 million tonnes of capacity, heading toward 15 million, chasing demand of 4 to 5 million tonnes guarantees weak pricing, low utilisation and rising unit costs. Second, raw-material dependence: with no commercial iron ore, about 84 percent of scrap imported, shipbreaking supply in decline and a possible EU scrap restriction from 2027, feedstock is exposed to world prices, freight, exchange rates and foreign regulation. Third, product narrowness: Bangladesh is competitive in commodity long steel but imports virtually all flat steel, so a large, higher-value segment of its own market is served from abroad. Fourth, energy and compliance costs — gas scarcity, high power prices and greening yards at up to Tk 1 billion each — fall on balance sheets already weakened by two years of losses. Finally, finance: RSRM's collapse shows how quickly a mid-sized producer can be lost, and banks now carry the sector's distress as their own problem.

Outlook and Conclusion

The near-term outlook depends on public construction. Steelmakers' hopes in late 2026 rested on revived government projects — the national economic council approved 12 projects worth Tk 1,68,780 crore in October 2026 — and on some easing of gas supply and interest rates. If construction revives, capacity is already in place, and pre-slump studies projected demand of 12 to 14 million tonnes by 2030; on per-capita use of about 45 kilograms, the long-run growth case remains intact even if the timetable has slipped. Investment is also shifting upmarket: BSRM's planned flat-steel plant and Meghna's new furnace plant point toward the import substitution the sector has lacked.

The risks are equally clear. Capacity planned in boom years will arrive in a market that may not need it, scrap supply faces both a thinner shipbreaking pipeline and a possible EU restriction, and energy supply — the binding constraint from the gas warnings at BSRM Steels' inauguration in 2008 to the near-zero pressure of 2026 — is still not secured. The true history of Bangladeshi steel is not a single mill founded in 1984 growing smoothly to 8 million tonnes. It is a 1952 re-rolling shop and a failed state steelworks, replaced by private Chittagong groups that learned to make world-grade rebar out of other countries' scrap and end-of-life ships — and that now have to survive until the demand their capacity was built for returns.