For most of the twentieth century, Bangladesh was a country in two pieces. The Jamuna, the name the Brahmaputra takes as it crosses the country, runs down its middle like a border: one of the largest rivers on earth by discharge, several kilometres wide, braided into shifting channels that eat their banks and rebuild their islands every monsoon. East of it lay Dhaka, Chittagong and the ports; west of it, the whole north-west, Rajshahi, Rangpur, Khulna's hinterland, a third of the nation. Between them, until 1998, there was no bridge at all. Every lorry, bus and train passenger crossed by ferry, and the ferries queued for hours, ran aground on shifting shoals, and stopped in fog and flood.
The Jamuna Bridge, opened on 23 June 1998, ended that division. At 4.8 kilometres it was the eleventh longest bridge in the world on the day it opened and the longest in South Asia; it remained Bangladesh's longest bridge until the Padma Bridge passed it in 2022. It carried a road, a railway, a power line and a gas pipeline across the river in a single structure, and it changed the economic geography of the country more than any single work before or since. This is the story of how it was built, what it did, and why, less than thirty years later, Bangladesh had to build a second bridge beside it.
A Country Cut in Two
The demand for the bridge is almost as old as the country. The politician Abdul Hamid Khan Bhashani raised it in 1949; the United Front put it in its famous 21-point manifesto for the 1954 provincial elections; Sheikh Mujibur Rahman promised it in 1970. The engineering case was harder than the political one. The Jamuna is not a river that sits still to be bridged: its channels wander across a belt more than ten kilometres wide, its banks erode on a scale measured in whole villages, and any bridge must be pinned in place by training works that discipline the river into passing beneath it. The story of that instability, and of the land the Jamuna takes and gives back, is told in our account of river erosion in Bangladesh.
The ferry era that the bridge ended deserves a paragraph of its own, because a generation that has only ever driven across can hardly picture it. The main crossings, at Bahadurabad and Nagarbari on the Jamuna and at the Goalanda and Mawa ghats on the Padma, were small towns of waiting: queues of lorries stretching for kilometres, sometimes for days when the river ran low and the ferries grounded on shoals, or when winter fog closed the channel entirely. Perishable cargo rotted in the queue. Passengers crossed in overloaded launches in all weathers, and every few years a vessel went down with heavy loss of life. The north-west, which grows much of the country's food, was in effect rationed by the river: its surpluses could not reliably reach the cities that needed them, and the cities' goods arrived in the west late and dear. Economists of the period spoke of the west as a region held back not by its soil or its people but by a ferry timetable. That is the problem the bridge was built to solve, and it explains why its opening in 1998 was celebrated as a second liberation day in the districts west of the river.
A British firm, Freeman Fox and Partners, made a first study in 1969; the Japan International Cooperation Agency studied a road and rail crossing in 1973, and its follow-up put the cost at 683 million dollars against an economic return so low that the project was shelved. It was revived in the 1980s in a new form, as a multipurpose bridge carrying gas and power as well as traffic, and in 1985 the Jamuna Multipurpose Bridge Authority was created to build it. Bangladesh taxed itself for the crossing in advance: a Jamuna Bridge surcharge and levy raised some Tk 5.08 billion from the public before the main contracts were let. Studies between 1986 and 1989 fixed the site, between Sirajganj on the west bank and Bhuapur in Tangail on the east, and in 1992 the financing was settled with the World Bank's IDA, the Asian Development Bank and Japan's OECF.
Building Across a Wild River
The foundation stone was laid on 10 April 1994, and physical work began that October. The main bridge contract went to South Korea's Hyundai Engineering and Construction on a design-and-build basis, to a design by T. Y. Lin International of San Francisco. The structure they built is a precast, prestressed concrete box girder, assembled by the balanced cantilever method: segments cast on shore, carried out and stitched together span by span, on an erection gantry some 200 metres long that was among the largest in the world at the time.
Below the waterline the work was harder. The bridge stands on fifty piers, themselves founded on great tubular steel piles, up to 3.15 metres in diameter, driven deep into the riverbed, emptied of sand by airlifting and filled with concrete. The deck that resulted runs 4.8 kilometres across 49 main spans of about 99 metres each, 18.5 metres wide, with approach viaducts and some sixteen kilometres of approach roads and river training works beyond it. The main bridge cost 696 million dollars; the whole project, with its training works, roads and resettlement, came to about 1.24 billion dollars, of which the three lenders supplied 200 million dollars each in loans at one per cent interest.
On 23 June 1998 the bridge opened to traffic, named for Sheikh Mujibur Rahman as the Bangabandhu Bridge. In February 2025 the government formally restored its original name, and it is the Jamuna Bridge again.
What the Bridge Carries
The Jamuna Bridge was designed as a corridor, not just a crossing. Its deck carries a four-lane road, two lanes each way. Along its northern side runs a dual gauge railway, a single track able to take both metre gauge and broad gauge trains, which in 1998 joined the eastern and western rail networks of Bangladesh into one system for the first time in the country's history. Cantilevered from the deck are pylons carrying a 230 kilovolt power interconnector, tying the western grid to the east; telecommunication cables run inside the box girder; and beneath the southern cantilever hangs a 750 millimetre high-pressure gas pipeline, which took natural gas west of the Jamuna for the first time, to power stations and fertiliser plants that had run on costlier fuel.
Each of those five functions mattered. But it was the combination that made the bridge an economic event rather than an engineering one: for the first time, the north-west was connected to the capital and the seaports by road, rail, power and gas simultaneously.
What It Changed
The simplest measure is time. A lorry journey from Dhaka to Rangpur or Rajshahi that had been built around ferry queues, and could stretch past a day when the river was difficult, became a drive of five or six hours. The crossing itself, hours of waiting at the ghats at Nagarbari or Bahadurabad, became ten minutes on the bridge.
Around that saving, an economy rearranged itself. The north-west's farm produce, its rice, potatoes, vegetables and jute, could reach Dhaka's markets and Chittagong's docks while it was still fresh, and the region's farmers began planting for the capital's demand rather than for subsistence against the ferry timetable. Fertiliser, fuel and manufactured goods moved the other way at lower cost. Land values and investment rose along the corridor; towns at the bridgeheads, Sirajganj and Bhuapur and the growing settlement at the eastern end, thickened into commercial centres. The bridge also carried a quieter traffic: students, patients, officials and families for whom the west had been a separate country in practice. In the national imagination it did something similar, closing a gap that had structured Bangladeshi life since before independence. The rivers of Bangladesh had always united the delta's soil and divided its people; after 1998, the largest of them was crossed.
Cracks, Repairs and a Bridge at Its Limit
Success loaded the bridge beyond its design life early. Traffic grew far faster than forecast, and within a decade cracks were found in the concrete deck and webs of almost all its segments. A Bangladesh University of Engineering and Technology investigation in 2006 traced the cracking's causes; in early 2008 the government announced it would sue Hyundai over the design; and a long programme of repair followed, replacing expansion joints, strengthening the deck with carbon fibre strips and fabrics, and sealing cracks, with BUET engineers monitoring the structure's health for years afterward.
The railway suffered differently. Cracks and load limits forced trains onto the bridge at 20 kilometres an hour, taking twenty minutes to cross and the better part of an hour in the stations at either end; its single track could pass at most about 22 trains a day, and axle-load limits kept heavy broad gauge freight off it altogether. By the 2010s the country's only Jamuna rail crossing was its bottleneck: the bridge that had joined the network had become the constraint on it.
The Second Crossing: Jamuna Railway Bridge
The answer was a second bridge, for trains alone. Three hundred metres upstream of the 1998 bridge now stands the Jamuna Railway Bridge: 4.8 kilometres of dual gauge double track, built by Bangladesh Railway with Japanese financing. The foundation stone was laid in November 2020, piling began in March 2021, and construction was completed in December 2024, at a cost of Tk 16,781 crore, of which the Japan International Cooperation Agency provided some 72 per cent. Where the old bridge squeezes trains onto one track at walking pace, the new one is built for 88 trains a day at speeds up to 120 kilometres an hour.
The first commercial train, the Silk City Express from Rajshahi to Dhaka, crossed on 12 February 2025, and the bridge was formally inaugurated on 18 March 2025. It had been built as the Bangabandhu Sheikh Mujib Railway Bridge; a gazette notification in December 2024 renamed it the Jamuna Railway Bridge, and its stations took new names to match, Ibrahimabad on the Tangail side and Soydabad on the Sirajganj side. Railway officials themselves add the honest caveat: the bridge's full benefit waits on doubling the single-track line from Joydebpur to Ishwardi that feeds it.
With trains gone, the old bridge changed character. In 2025 its railway track was lifted so the roadway could be widened by about eleven feet, and the Jamuna Bridge settled into its second life as a road bridge, still carrying the power line, the cables and the gas.
Conclusion
Stand on the bank at Sirajganj today and there are two bridges where for a century there were none: the concrete box girder of 1998 that ended Bangladesh's division into east and west, and the steel railway bridge of 2025 that its success made necessary. The first bridge remains the more consequential. It was the eleventh longest in the world when it opened, but its real measure is not in the record books. It is in the ordinary fact, unremarkable now to anyone under thirty, that a farmer in Rangpur sells vegetables in Dhaka, that a train runs from Khulna to Sylhet without touching a ferry, and that the north-west of Bangladesh is no longer another country across the water.